How Long Does Bathroom Remodeling Typically Take?
Straight answers from a Conway, AR remodeling team: 20 years of experience, in business since 2014, 500+ remodels, licensed and insured.
Quick Answer
Most bathroom remodels take 3 to 6 weeks of construction, or about 2 to 3 months once you add design, selections and ordering. A powder room refresh can finish in 3 to 4 weeks, while a custom primary bath or full gut renovation often runs 8 to 12 weeks or more.
By the All-Star Renovations team · 11 Arnett Ln, Conway, AR 72032 · Updated October 2026
Typical Construction Time by Project
Powder room or refresh
About 3 to 4 weeks. New vanity, toilet, lighting, paint and flooring with no layout changes.
Small full bathroom
About 4 to 6 weeks. A complete update of a hall or secondary bath with the plumbing left in place.
Standard guest bathroom
About 5 to 7 weeks. New shower or tub surround, tile, vanity and fixtures.
Custom primary bath or full gut
About 8 to 12 weeks or more. Walls down to the studs, layout changes, custom showers and specialty finishes.
How Long Each Phase Takes
Planning and design
1 to 3 weeks to measure, choose a layout and finalize selections. Ordering can start once choices are locked in.
Demolition
2 to 4 days to remove the old fixtures, surfaces and damaged materials.
Plumbing and electrical rough-in
2 days to 2 weeks, depending on whether anything moves. An inspection may be required before walls close.
Waterproofing and tile
1 to 3 weeks, including curing time for mortar, grout and waterproofing so the shower lasts.
Fixtures and finishes
1 to 2 weeks for the vanity, toilet, glass, trim, paint, caulk and final cleanup.
What Slows a Project Down
Three things add the most time. Custom vanities, special-order tile and frameless glass can carry lead times of 6 to 12 weeks, so we order them before demolition whenever we can. Hidden damage, such as rotted subfloor around an old toilet or a slow shower leak, has to be repaired before anything new goes in. Permits and inspections add scheduling steps when plumbing or electrical work changes.
A grout-free All-Star Shower System or a tub-to-shower conversion is usually much faster than a full tile remodel because there is less curing time.
Questions
Can I use my bathroom during the remodel?
Why does planning take so long?
Is a shower-only replacement faster?
Ready for a free in-home quote?
Request a free in-home quote online or call (501) 504-3398. Hours: Mon–Fri 7:30 AM–5:00 PM, Sat 7:00 AM–7:00 PM, Sun 9:00 AM–3:00 PM.
Free download
Tub-to-Shower & Walk-In Shower Planning Checklist
A printable 2-page checklist: measurements, safety features, budget questions and what to ask any contractor.
Related Services & Guides
Ready to Transform Your Home?
Request your free, no-obligation in-home estimate or pick a time on our calendar. Our Central Arkansas remodeling specialists confirm by call or text.
- Call Our Experts(501) 504-3398Tap to dial
- Text / SMS Support(501) 504-3398Fast mobile response
- Email Officeinfo@allstarreno.comReplies within one business day
- Central Arkansas Service AreaConway HQ · 50-mile radiusMon–Fri 7:30–5 · Sat 7–7 · Sun 9–3